Path forecasts, defined as sequences of individual forecasts, generated by vector autoregressions are widely used in applied work. It has been recognized that a profound econometric analysis often requires, besides the path forecast, a joint prediction region that contains the whole future path...
Persistent link: https://www.econbiz.de/10011410267
Benchmarking methods are widely used in the regulation of firms in network industries working under heterogeneous exogenous environments. In this paper we compare three recently developed estimators, namely conditional DEA (Daraio and Simar, 2005, 2007b), latent class SFA (Orea and Kumbhakar, 2004;...
Persistent link: https://www.econbiz.de/10011483291
Persistent link: https://www.econbiz.de/10011506307
Few authors have studied, either asymptotically or in finite samples, the size and power of seasonal unit root tests when the data generating process [DGP] is a non-stationary alternative aside from the seasonal random walk. In this respect, Ghysels, lee and Noh (1994) conducted a simulation...
Persistent link: https://www.econbiz.de/10011524855
This paper shows that the presence of conditional staging in R&D (Research & Development) has a critical impact on portfolio risk, and changes diversification arguments when a portfolio is constructed. When R&D projects exhibit option-like characteristics, correlation between projects plays a...
Persistent link: https://www.econbiz.de/10011373815
This paper analyzes nuclear power plant investments using Monte Carlo simulations of economic indicators such as net present value (NPV) and levelized cost of electricity (LCOE). In times of liberalized electricity markets, largescale decarbonization and climate change considerations, this topic...
Persistent link: https://www.econbiz.de/10012134467
Persistent link: https://www.econbiz.de/10012021576
Persistent link: https://www.econbiz.de/10012003673
In this research, the concept of Duration with a new application in project management has been defined. The Duration of each project provides the project manager with a combined measure containing concepts of return, cost and time of the project. Further in this article, the changes in project...
Persistent link: https://www.econbiz.de/10012126909